• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

News and entertainment worth sharing – York and North Yorkshire

  • News
  • Radio
  • Vouchers
  • WIN
  • More
    • Tickets
    • Lifestyle
    • Advertise
    • About
    • Contact

Watch: Huge crane taken down at York Guildhall – but project is running a year late

Wed 4 Aug

The crane is taken down. Photograph: Richard McDougall

Wed 4 Aug 2021  @ 7:23am
Chloe Laversuch - Local Democracy Reporter
News

The big crane has been removed at the site of the historic York Guildhall,  which is currently being restored and redeveloped.

Work on the £20 million restoration project began in autumn 2019 and is due to be finished by the end of the year, around 12 months later than expected.

The huge tower crane was floated down the river by barge in January 2020 to do the heavy lifting for the development.

Related

Work has continued on the site throughout the pandemic, but the programme has been hit by several setbacks including high river levels throughout February 2019, the discovery of historic human remains on the land, further archaeological items and a shortage of some materials as a result of the pandemic.

The river was used to transport materials to and from the site to avoid construction traffic clogging up narrow city centre streets.

Photograph: Richard McDougall

Heavy construction work at the site has now finished and the tower crane has been dismantled by a separate 100 tonne crane that is working from a barge on the river Ouse.

When the Guildhall redevelopment project is finished the University of York is set to take a 15 year lease on the venue to create a hub for businesses and events.

The site will also boast a cafe, separate riverside restaurant, offices, meeting rooms and conference space.

Costs spiralled

Photograph: Richard McDougall

The cost of the project has spiralled since initial proposals to refurbish the site were first put forward in 2013 and in 2018 the council pulled out of a £9m deal to transform the site.

Since the start of the refurbishment work in 2019, the costs have increased by at least a further £1.5m.

The Guildhall was the home of City of York Council until 2013, when the local authority moved to West Offices near the Grand Hotel and launched a review of the condition of the historic buildings.

Photograph: David Dunning
An artist’s impression of the Guildhall after the renovation

Investigations found it was in need of extensive work to repair structural problems.

The Guildhall, which sits alongside the River Ouse, was originally built in the 15th Century.

Significant repairs took place to repair the building after a fire during the Second World War, in the Baedeker raids in 1942.

[tptn_list limit=3 daily=1 hour_range=1]

The Guildhall is owned by the council and is made up of Grade I, II* and II listed buildings built around a 15th-century main hall.

Economic experts have forecast that when the redeveloped venue reopens it will create up to 160 jobs, according to the University of York.


Trending »


Primary Sidebar

Footer

Contact us

General
01904 375 029

Studio/competitions
01904 375 030

Email YorkMix »

5-6 King's Court
Shambles
York  YO1 7LD

Listen to us

You can listen to YorkMix Radio using your DAB+ radio, Alexa or Google smart speaker, or online using the links below.

Click here to listen to YorkMix Radio »

Download the app from Google Play store
Download the app from Apple App store
About us

YorkMix is a trading name of
York Sound Ltd

Registered in England
Company no: 12831940
VAT no: GB289462452

YorkMix Radio public file

  • About
  • Public file
  • Privacy policy
  • Corrections & complaints
  • Contact

Copyright © 2025 YorkMix