• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

News and entertainment worth sharing – York and North Yorkshire

  • News
  • Radio
  • Vouchers
  • WIN
  • More
    • Tickets
    • Lifestyle
    • Advertise
    • About
    • Contact

York residents urged to plan ahead as huge transport schemes set to bring months of disruption

Thu 13 Jul

roadworks sign
Photograph: YorkMix

Thu 13 Jul 2023  @ 12:29pm
YorkMix
News, Transport

York is set to suffer from ‘short term pain for long term gain’.

That’s the message as City of York Council embarks on an unprecedented programme of major transport schemes.

The roadworks are set to bring months of travel disruption – and residents are being urged to plan ahead.

At a media briefing this morning (Thursday), the council’s executive lead on transport Cllr Pete Kilbane said: “We understand that it’s going to be frustrating.

“But it will be short term pain for a long term gain, which should make it easier for everybody to move about the city.

“We’re investing millions in the transport network. We want to make it safer for walkers, wheelers, and cyclists.”

The council pledged to keep people informed of the impact on their journeys before work begins on projects.

It has already outlined the schemes on its ‘plan ahead’ web page.

And you can sign up for roadwork alerts here.

Five key projects

Queen Street with York Station in the background. Photograph © Google Street View

York has five big projects, which will create traffic disruption now and potentially up to 2025.

York Central

Leeman Road/Station Rise – temporary traffic signals are already in place during the construction of a revised road layout and will last up to 18 months. A full 24/7 closure of the Leeman Road Tunnel is needed for works in mid 2025.

Water End – Four weeks of overnight closures in March/April. Extended period of 24/7 westbound lane closure to undertake works on Severus Bridge – timings to be confirmed.

Tadcaster Road

Work is underway and will last until autumn on an upgrade of the road’s drainage, plus improvements for pedestrians, cyclists and buses.

Work is carried out Monday to Friday between 7.30am and 6.00pm, with traffic signals and narrow lanes.

[adrotate group=”3″]

Station Gateway

Work will start at a date to be fixed this autumn. It will include demolishing the Queen Street bridge, with two weekend closures of Queen Street. A diversion route will run through the LNER car park.

The work should improve access to the station and add ‘welcoming new public spaces’.

York Outer Ring Road

Work to repair two bridges on the A1237 in the north of the city are due to end next week.

Dualling of the A1237 from the A19 to Hopgrove junctions is the next big project, subject to planning permission. Advance utility works on the roundabouts could begin later this year, with the main works to ‘commence in 2024/25’.

City centre security measures

This rolling programme has already begun, with the anti-terror bollards installed on Lendal and High Petergate, and work underway to install them on Spurriergate.

Walking and cycling ‘unaffected’

Labour’s Pete Kilbane. Photograph: York Labour Group

The council says that ‘active travel’ – walking, wheeling and cycling – will be ‘largely unaffected’ by the schemes.

Cllr Kilbane said: “I do want to stress that, for residents who can, this is a real opportunity for them to actually change the way that they travel around the city.

“We are going to maintain active travel routes – for cycling, walking, wheeling – wherever possible.

“And for many people that may well be the quickest and easiest way for them to get around during the progress of the works.”

Detailed plans for the individual projects “will be developed and publicised in advance with signed diversions provided for road/lane closures”.

Work to mitigate the traffic disruption will include:

  • Efforts to coordinate the works to reduce the impact as much as possible – although “the scale of the some of the projects means that works are difficult to suspend/remove once commenced”
  • CCTV monitoring of the road network to enable remote traffic signal changes to respond to problems
  • Programming works to avoid peak times, around school times and holidays, and avoiding key events like the races and Christmas market.

Cllr Kilbane said the disruption will be worth it. “Essentially, we will be left with a network in the city that’s vastly improved. One that will be hopefully easier for everybody to move around.”

[tptn_list limit=3 daily=1 hour_range=1]


Trending »


Primary Sidebar

Footer

Contact us

General
01904 375 029

Studio/competitions
01904 375 030

Email YorkMix »

5-6 King's Court
Shambles
York  YO1 7LD

Listen to us

You can listen to YorkMix Radio using your DAB+ radio, Alexa or Google smart speaker, or online using the links below.

Click here to listen to YorkMix Radio »

Download the app from Google Play store
Download the app from Apple App store
About us

YorkMix is a trading name of
York Sound Ltd

Registered in England
Company no: 12831940
VAT no: GB289462452

YorkMix Radio public file

  • About
  • Public file
  • Privacy policy
  • Corrections & complaints
  • Contact

Copyright © 2025 YorkMix